Model NO.: RMMOULD741254
Runner: Hot Runner
Design Software: UG
Installation: Fixed
Standard: HASCO
Customized: Customized
Name: Plastic Tabletop Mould
Cavity: Single/Multi
Core&Cavity Material: P20/718/etc
Base Material: 45#
Surface: Polish / Texture
Hot Runner Brand: Chinese Brand / Yudo
Cooling: Water Cooling
Designing Software: Ug/PRO-E/CAD
Mould Life: 300, 000-3, 000, 000 Shots
Design Days: 3 Days
Trademark: REMO
Specification: International Standard
Origin: Taizhou China
HS Code: 8480719090
As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.Following information is essential for your better understanding on our moulds
Name: Description
Products' infomation we need to make quotation: Clear Pics/material/size/weight/wall thickness/targetting quantity and etc.
Mould Material: 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKD61 etc.
Mould Base: LKM, HASCO ecTC.
Cavity: Single/multi
Runner: Hot/cold
Mould Design: 3D/2D Drawing
Design Days: 3 days
Design Software: UG, PROE, CAD, CAE, CAM, CAXA etc.
Plastic Material: PP, PC, PS, PE, PU, PVC, ABS, PMMA etc.
Mould Life: 300, 000-3, 000, 000 shots
Injection System: Pin-point-gate
Polish System: Mirror Polish
Payment: 40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time: 15-60days
Specification: Depends on customers requirements.
Business Step | |||||||
1. R& D | We support customer R& D. Make the files or improve the design if you needed | ||||||
↓ ↓ ↓ | |||||||
2. Quotation Making | Mould Quotation will be finished in 1 day according to information we get | ||||||
↓ ↓ ↓ | |||||||
3. Negotiation | The quality, price, material, delivery time. payment item. ect | ||||||
↓ ↓ ↓ | |||||||
4. Mould Design | 3-5 days for mould and product 3D/2D drawing design | ||||||
↓ ↓ ↓ | |||||||
5. Mould | According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days | ||||||
↓ ↓ ↓ | |||||||
6. Mould Testing | When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference. | ||||||
↓ ↓ ↓ | |||||||
7. Sample shoot | If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory | ||||||
 ↓ ↓ ↓  | |||||||
8. Delivery | Delivery goods by sea or by air, according customers requirement |
precision seamless steel tube,seamless precision pipe,Precision bright tube,Precision bright seamless pipe
Shandong Fengbao Metal Products CO.,LTD. , https://www.fbsteelpipes.com