Winter equipment maintenance is about to start

Winter equipment maintenance is about to start In December, the Shenyang Railway Industry Group Jilin Cement Sleeper Factory began to enter the winter equipment maintenance, seize the opportunity for the new year, and grab the market.

After the completion of sleeper production in 2012, the plant immediately entered the equipment winter inspection. In the early stage of the inspection and evaluation of the equipment status, the plant had detailed arrangements for the specific maintenance tasks of the workshops. The chief engineer was responsible for the technical equipment. Out of the plan, the organization of engineering and technical cadres and excellent maintenance and repair powers are carried out in accordance with the plan.

Equipment overhaul is the last job of the year's production and operation, and it is also the key to whether or not the year of safety can be achieved. Therefore, at the same time when equipment maintenance plans are arranged, safety precautions are also deployed. It is required that all workshops and department cadres should always focus on the frontline of maintenance, rely on front-line command, face to face leadership, make specific arrangements, implement cadre safety guarantees, make reminders before shifts, and specialize in part-time security personnel, and must inspect the process of maintenance every day. Maintenance personnel are divided into several maintenance teams according to their tasks. In the inspection, safety precautions must be made in advance. Safety precautions should not be taken and maintenance activities should not be initiated. Special inspections are not performed according to regulations and operations are not performed to ensure safe production and safe maintenance.

Before the deadline, all overhaul work of the plant was carried out in an orderly manner, and efforts were made to fully complete the inspection and repair tasks by mid-December, to seize the opportunity for the new year, lay a solid foundation for equipment guarantees, and to learn and implement the party through practical actions. The spirit of the 18th National Congress.

Gear Ring

Gear Ring,Gear Shaft,Forging Wheel

Jiangyin Kaixin Heat Treatment Co., Ltd. , http://www.chforgedparts.com