Ten years of grinding a sword, a test for the edge.
Today, show the king, who is not fair?
[Swords, dozens of years]
The history of crane development in China must be discussed from Xu Gong, and the history of XMG's all-terrain development can be traced back to 2002.
In that year, XCMG brought out the most important phase of its growth history - the first all-terrain crane in the history of China's crane industry - QAY25.
QAY25 crane
The road to technology cannot be closed. In 2004, XCMG Heavy Industries Co., Ltd. continued to launch 160-ton and 200-ton all-terrain cranes. For the first time, six single cylinder plug telescopic arms, elliptical arm forming, and CAN bus control technology based on computer local area network were adopted. Between 2005 and 2006, Xugong’s heavy development momentum continued unabated, and 240 tons, 300 tons, 400 tons of oversized tonnage all-terrain cranes were launched.
Xugong all-terrain crane
At this point, Xugong Heavy fully established its leading position in the field of all-terrain cranes in China and firmly established its footing in the international field.
ã€Wind Power Road, Lufeng Mount】
On September 23, 2008, the 500-ton all-terrain crane successfully went offline at Xugong Heavy Assembly Plant. As the largest tonnage all-terrain crane independently researched and developed by China at that time, it attracted many eyes.
Xugong all-terrain crane
After obtaining 500 tons of successful experience, in order to prepare for the Shanghai Baoma Exhibition in November 2010, Xugong Hoisting Machinery Co., Ltd. started the research and development of 800-ton and 1000-ton all-terrain cranes at the same time!
On December 30, 2014, with the stable installation of China Wind Power 2 MW fan blades, the XCMG XCA5000 all-terrain crane with the highest tonnage and highest technological content in the world successfully completed the first fan hoisting task in the southwest wind field. The success of the first crane marks the Xugong XCA5000 becoming the world’s first 2,000-ton all-terrain crane for construction applications, highlighting Xugong’s leading position in the field of global hoisting and has a milestone significance for the development of China’s wheeled cranes.
ã€Tibetan device】in the body, waiting for action
Saying that the time came to the 2016 Shanghai BMW Exhibition, the most attention is undoubtedly the "Xinjiang Science and Technology, Green Energy, Quality Performance, Ultra High Performance" G platform to build the first 10,000-ton all-terrain crane XCA1200. Only 8 axles can drive up to 205 tons of body, bridge load is within 26t; highway driving status is controlled within 12t.
Xugong all-terrain crane
Equipped with XCMG's unique high-speed ratio reducer bridge hydraulic drive, six-bridge mechanical drive + hydraulic power drive mode, can carry the main boom, superlift, wind power arm, heavy load transition before and after the outrigger, heavy-duty transition climbing ability Up to 38%, Independent Suspension Chassis, Road Adaptability, Passivity Up 30%.
From the appearance alone, it can already be seen that it is not simple. 7 sections of 89m main arm, self-folding 25.3m wind power arm, easily meet 2.5MW wind power construction conditions. When the wind power is installed, only the truss arm folded on the main arm is extended, the main arm is extended, and the super-lifting can be realized, which changes the installation mode of the conventional crane.
After the construction is completed, it is only necessary to retract the main arm and refold the truss arm over the main arm to transfer to the field. The automatic folding wind arm structure saves time for dismantling and dismantling by at least 20 minutes. The entire process of dismantling and disassembling the boom does not require auxiliary lifting equipment, and the vehicle can be collected within 2 hours. The transfer efficiency is increased by 20%, and the transfer cost is greatly reduced.
When carrying out construction lifting in the fields of petrochemicals, bridges, and steel structures, it is only necessary to replace the legs and increase the eighth section of the arm. The total length of the 8th main boom is 102 meters.
In the true sense of realizing a multi-purpose machine, "deformation" reflects the high efficiency and economic cost savings.
The application of the fully closed hydraulic system makes the performance of the product even more outstanding. The lifting speed, working efficiency, and micro-motion performance are perfect, and the reheating weather is not impetuous, and the oil temperature below 80°C is always maintained. The electronically controlled handle controls the output flow of the system to meet the requirements of the actuator. It reduces the throttling loss caused by the hydraulic valve, millimeter-level rotation micro-motion, and dares to challenge the installation of any sophisticated equipment. The average fuel consumption under comprehensive conditions can be reduced by 15 %.
From the coverage of working conditions, heavy transfer, improved efficiency, cost savings, and safe construction, all aspects are exhaustive, and there is no omission. The aim is to create a true “wind power installation†for wind power installation.
There are real materials, but also material.
With the continuous improvement of people's aesthetics and the pursuit of beauty, the competition of appearance design of crane products has become a fashion. From modeling, interior to materials, the XCA1200 can be said to be impeccable.
V-shaped front face design, "Hawk eye" bionic headlights
12.3-inch large mirror display, bid farewell to the mechanical pointer, instead of using a virtual instrument interface, driving information display rich, more intuitive, gestures, all information has been panoramic view.
Keys arranged in order, easy to use, full of feedback
There is a 10.4 inch double color touch screen in the operating room
The buttons on the left-hand side are clearly distinguished, and 13 small areas integrate 13 intelligent and informatized interactive technologies to control vehicle safety protection, action lifting and operating environment. Compared with the traditional key-press waterproof, the information coverage is more comprehensive, and all the information input and output during the hoisting process is introduced into the system. Everywhere, the designers are meticulously crafted and devoted themselves to the success of XCA1200's Xiuwai Huizhong and internal and external cultivation.
[Not perfect, not show the king]
The XCA1200 all-terrain crane is another milestone for China's superlift equipment innovation. It is a truly global initiative in technology and has 12 core patents that are completely owned by itself. It can meet the challenges of the most demanding wind power construction environment.
Mature super-combination arm technology, straight arm, perfect ratio
There is no need for an auxiliary crane. Since the weights are self-assembled and disassembled, I don't have any of you. This is the lead. This is the strength.
Self-folding wind power arm head, Xugong's secret weapon for wind power installation
Heavy-duty outrigger installation and outrigger pressure test, XCMG always knows how to move steadily and steadily.
30% slope carrying large-arm climbing and standing slope tests, demonstrating its climbing ability and braking safety without reservation
Mountain heavy-duty driving reliability test, XCA1200's play did not disappoint the designers
All along, special cranes for wind power lifting are the core products of Xugong’s unique technical and construction engineering method advantages and user reputation. Nowadays, XCA1200 successfully completes the first wind power crane. This world's most advanced and smartest 1000-ton all-terrain crane is another milestone for China's superlift equipment innovation! (This article is from Xugong)
Compact Size: Brazed heat exchangers corrugated plates create multiple flow channels, maximizing the heat transfer surface area within a small footprint. This makes them ideal for applications where space is limited.
Efficient Heat Transfer: The corrugated plates in a brazed heat exchanger create turbulence in the fluid flow, enhancing heat transfer efficiency. The turbulent flow promotes better mixing of the fluids and minimizes the formation of stagnant zones, leading to improved heat transfer rates.
High Thermal Efficiency: The brazing process used in the construction of these heat exchangers ensures a highly conductive joint between the plates.
Reduced Fouling: The design of brazed heat exchangers with smooth and continuous surfaces minimizes the potential for fouling. The absence of gaskets or crevices reduces the likelihood of accumulation of debris or scale, resulting in lower maintenance requirements and improved overall performance.
Wide Range of Applications:
-HVAC systems
-Refrigeration
-Process cooling
-Industrial heating/ cooling.
-liquid-to-liquid and gas-to-liquid heat transfer processes
In an asymmetrical brazed plate heat exchanger, the hot fluid flows through channels with a larger depth, which allows for greater heat transfer. The cold fluid flows through channels with a smaller depth, which offers less resistance to flow, reducing the pressure drop.
This design is particularly useful in applications where one fluid is at a much higher temperature than the other, such as in a Condenser or Evaporator.
Water Cooled Heat Exchanger,Evaporator Copper Plate Heat Exchanger,Solar Heat Pump Evaporator
Jiangsu Baode Heat-Exchanger Equipment Co.,LTD , https://www.baodeexchanger.com