Eco-city metabolic disease hospital construction project

Project Name: Eco-City Metabolic Disease Hospital Construction Project Progress Phase: Project Approval Verification Construction Period: January 2012-December 2013 Major Equipment: Cranes, Fire Fighting Equipment, Security Equipment, Electrical Installations, Lighting Equipment, Ventilation Equipment, Medical Equipment ,electronic display.
Project Profile: The project is located in the block 05-04-05 of the Eco-City, Tanggu District, Tianjin. A hospital is built with a total area of ​​25,000 square meters and a total construction area of ​​40,000 square meters.
The total investment of the project is 230 million yuan.
Construction Unit: Tianjin Eco-city Construction Investment Co., Ltd. Postal address: 269 Hanbei Road, Hangu District, Tianjin Postcode: 300467
Contact person: Guan Qingyou phone, 59918140
Related Developments: Tower Crane Infrastructure Project

Premium Rim Assembly Solid Tyre

China Durable Solid Tires,Rubber Solid Tyres manufacturer, choose the high quality Rim Assembly Solid Tyre,Rim Assembled Solid Tyres, etc.

Durable Solid Tires,Rubber Solid Tyres,Rim Assembly Solid Tyre,Rim Assembled Solid Tyres

Zhejiang Hengbang Rubber Products Co., Ltd. , https://www.hengbang-rubber.com