Marley Cross Flow Cooling Tower Film Fill Packing

Model NO.: LTFIll
Noise Level: Low
Application Fields: Industrial
Certification: RoHS
Condition: New
Color: Carbon Black, etc
Thickness: 0.27mm-0.4mm
Length Weight: 0.45kg
OEM: OEM
Shaping Mode: Plastic Extrusion Mould
Width: 2FT,3FT, 4FT, 5FT
Trademark: longtime
Transport Package: in Bundle,Wooden Pallet/by Air,DHL,by Sea,by Train
Specification: 915mm*886mm
Origin: Hebei
HS Code: 3926909090
Model NO.: LTFIll
Noise Level: Low
Application Fields: Industrial
Certification: RoHS
Condition: New
Color: Carbon Black, etc
Thickness: 0.27mm-0.4mm
Length Weight: 0.45kg
OEM: OEM
Shaping Mode: Plastic Extrusion Mould
Width: 2FT,3FT, 4FT, 5FT
Trademark: longtime
Transport Package: in Bundle,Wooden Pallet/by Air,DHL,by Sea,by Train
Specification: 915mm*886mm
Origin: Hebei
HS Code: 3926909090
Key Features of  Marley Cross Flow Cooling Tower Film Fill Packing
Marley Cross Flow Cooling Tower Film Fill Packing


1. Greater cooling capacity in a given space
2.Low-clog designs available
3.Available in bottom supported or hanging designs
4. Integral louvers and eliminators available in crossflow 
5.High-temperature designs availableigle-piece, full-height counterflow designs available 


Marley Cross Flow Cooling Tower Film Fill Packing data 
Marley Cross Flow Cooling Tower Film Fill Packing
 
Name Marley Cross Flow Cooling Tower Film Fill Packing
  Cross Flow Cooling Tower PVC Filler
Material PVC PP
Size 915mm 1220mm 1520mm*any*0.25mm-0.38mm(W*L*T)
Profile Height 19mm
Inclination 5°
Temperature suitable 65ºC~ -35 ºC

Main Features
Light weight, high strength
Good fire resistant, Ventilation resistance small
Anti-corrosive, long service time
Large contact area and strong wetting ability

Usage of Marley Cross Flow Cooling Tower Film Fill Packing

Marley Cross Flow Cooling Tower Film Fill Packing

Packaging & Shipping of Marley Cross Flow Cooling Tower Film Fill Packing

Cooling tower material

Delivery time:within 5-15days after deposit

Package:pallet,wooden box

Marley Cross Flow Cooling Tower Film Fill Packing

 

Our company supply various types of cooling tower fill as the following photo shows:

Marley Cross Flow Cooling Tower Film Fill Packing
 

Cooling tower fill Factory production pictures

Marley Cross Flow Cooling Tower Film Fill Packing


FAQ
 1.Q: Are you Trading Company or Factory:
   A:.  We are Trading Company and also Factory
 2.Q: What's your production ability for one month?
   A:We can product Metric Tons per Month 200000 pcs  .
 3.Q:  What's your MOQ?
   A:500pcs
 4.Q:What's your shipping port?
   A:Tianjin,shanghai or any port as your reqirement 
 5.Q: What's your Payment Terms?
   A:L/C,T/T,Western Union  
Try order is acceptable. Sample is available.
Welcome to inquire, we will feedback within  24 hours.
Key Features of  Marley Cross Flow Cooling Tower Film Fill Packing
Marley Cross Flow Cooling Tower Film Fill Packing


1. Greater cooling capacity in a given space
2.Low-clog designs available
3.Available in bottom supported or hanging designs
4. Integral louvers and eliminators available in crossflow 
5.High-temperature designs availableigle-piece, full-height counterflow designs available 


Marley Cross Flow Cooling Tower Film Fill Packing data 
Marley Cross Flow Cooling Tower Film Fill Packing
 
Name Marley Cross Flow Cooling Tower Film Fill Packing
  Cross Flow Cooling Tower PVC Filler
Material PVC PP
Size 915mm 1220mm 1520mm*any*0.25mm-0.38mm(W*L*T)
Profile Height 19mm
Inclination 5°
Temperature suitable 65ºC~ -35 ºC

Main Features
Light weight, high strength
Good fire resistant, Ventilation resistance small
Anti-corrosive, long service time
Large contact area and strong wetting ability

Usage of Marley Cross Flow Cooling Tower Film Fill Packing

Marley Cross Flow Cooling Tower Film Fill Packing

Packaging & Shipping of Marley Cross Flow Cooling Tower Film Fill Packing

Cooling tower material

Delivery time:within 5-15days after deposit

Package:pallet,wooden box

Marley Cross Flow Cooling Tower Film Fill Packing

 

Our company supply various types of cooling tower fill as the following photo shows:

Marley Cross Flow Cooling Tower Film Fill Packing
 

Cooling tower fill Factory production pictures

Marley Cross Flow Cooling Tower Film Fill Packing


FAQ
 1.Q: Are you Trading Company or Factory:
   A:.  We are Trading Company and also Factory
 2.Q: What's your production ability for one month?
   A:We can product Metric Tons per Month 200000 pcs  .
 3.Q:  What's your MOQ?
   A:500pcs
 4.Q:What's your shipping port?
   A:Tianjin,shanghai or any port as your reqirement 
 5.Q: What's your Payment Terms?
   A:L/C,T/T,Western Union  
Try order is acceptable. Sample is available.
Welcome to inquire, we will feedback within  24 hours.

Piston Rod

The shaft is covered with a rubber ring, and the rubber ring is evenly arranged with oil injection holes around the rubber ring to reduce the friction between the connecting rod and the sleeve. The connection head is equipped with a spring to reduce the noise caused by the resonance of the connecting rod and the dust cover, thereby achieving the effect of vibration reduction and noise reduction , Extend the service life of the shock absorber and enhance the practicality of the shock absorber.

Piston Rod,Piston Connecting Rod,Piston And Rod,Piston Conrod

Ningbo Huilexin Technology Co.LTD , https://www.oemshockabsorbers.com