Stud Anchor Chain
1. Standard length is 27.5m per piece,we also can produce and cut anchor chains or stud link chains.
2. Material: alloy steel, generally including CM390, CM490, CM690, or according to your requirement
3. Grade :U2&U3 stud link anchor chains, stud link chains and open link chain
4. Surface treatment: self color, black painted, zinc galvanized, hot dip galvanized or according to customer's requirement.
5. The tension breaking load conforms to National Standard.
6. Specification: 12.5-70mm, mainly adapt to vessels, fish net tenesmus, mine, municipal engineer, new established garden decoration
7. Production process: (1) material cutting (2) heating (3) curving (4) welding (5) thorn cutting (6) pressing (7) heating treatment (8) Blind bolts (9) polishing (10) painting or galvanized
8. We also make U3 and U2 studless link chain and open link chain from 12.5mm to 70mm.
Specification:
Link Diameter (mm) |
Outside Length (mm) |
Outside width (mm) |
Proof  Load (KN) |
Break Load (KN) |
Weight(kg/m) | ||||
AM1 | AM2 | AM3 | AM1 | AM2 | AM3 | ||||
11 | 66 | 40 | 36 | 52 | 72 | 52 | 72 | 102 | 2.65 |
12.5 | 75 | 45 | 46 | 66 | 92 | 66 | 92 | 132 | 3.42 |
14 | 84 | 50 | 58 | 82 | 116 | 82 | 116 | 165 | 4.29 |
16 | 96 | 58 | 76 | 107 | 150 | 107 | 150 | 216 | 5.61 |
17.5 | 105 | 63 | 89 | 127 | 179 | 127 | 179 | 256 | 6.71 |
19 | 114 | 68 | 105 | 150 | 211 | 150 | 211 | 301 | 7.91 |
20.5 | 123 | 74 | 123 | 175 | 244 | 175 | 244 | 349 | 9.20 |
22 | 132 | 78 | 140 | 200 | 280 | 200 | 280 | 401 | 10.60 |
24 | 144 | 86 | 167 | 237 | 332 | 237 | 332 | 478 | 12.61 |
26 | 156 | 94 | 194 | 278 | 389 | 278 | 389 | 556 | 14.80 |
28 | 168 | 101 | 225 | 321 | 449 | 321 | 449 | 642 | 17.17 |
30 | 180 | 108 | 257 | 368 | 514 | 368 | 514 | 735 | 19.71 |
32 | 192 | 115 | 291 | 417 | 583 | 417 | 583 | 833 | 22.43 |
34 | 204 | 122 | 328 | 468 | 655 | 468 | 655 | 937 | 25.32 |
36 | 216 | 130 | 366 | 523 | 732 | 523 | 732 | 1050 | 28.38 |
Waste Water Treatment Equipment The process of purifying sewage in order to meet the water quality requirements for discharge into a certain water body or reuse. Electroplating wastewater treatment equipment is used to meet the requirements of environmental protection and resource recycling.
Due to the promulgation of the new national electroplating industry emission standard "GB21900-2008", the implementation of the new standard by electroplating companies across the country will undoubtedly bring huge pressure on environmental protection and technological innovation, and traditional treatment processes have been difficult to meet environmental protection and resource recycling requirements. Waste Water Treatment Equipment,Waste Air Treatment Equipment,Pp Waste Water Bucket,Waste Treatment Device Wuxi Xingyi Intelligent Environment Protection Equipment Co.,Ltd. , https://www.wxxingyi.com |