Sinochem Lanzhou Yizhang Fluorine Chemical Project is scheduled to be put into operation by the end of the year

Drying equipment

Mao Tengfei, deputy secretary of Luzhou Municipal Party Committee, led the relevant municipal departments to the contact point, Sinochem Blue Sky Yizhou Yizhang Fluorine Chemical Project, to conduct on-site office work to solve the difficulties and problems in project construction and further accelerate the progress of the project. It is reported that the Yizhang Fluorine Chemical Project is progressing smoothly and is scheduled to be completed and put into operation by the end of this year.

The first phase of the Yizhang Fluorine Chemical Project is planned to cover an area of ​​more than 600 mu, with a total investment of 1 billion yuan. It is planned to be completed and put into operation by the end of this year, and the annual sales income after stable operation is expected to reach 1 billion yuan, and the annual profit and tax will reach 300 million yuan. The second phase of the project has been implemented ahead of schedule with a total investment of about RMB 500 million. It is planned to be completed and put into operation in 2013. It is estimated that the annual sales income will reach 1.5 billion yuan and the annual profit and tax will reach 400 million yuan. In the later period, Sinochem Blue Sky will continue to increase its capital investment, with an estimated investment of 5 billion yuan and a planning area of ​​800 acres. The construction of a fluorine chemical project will be carried out in Yizhang and the Yizhang Fluorine Chemical Cycle Industrial Park will be built into a world-class fluorine chemical base.

In order to speed up the construction of the project, Yizhang County will provide hundreds of thousands of efficient and high-quality services for the project and continuously optimize the construction environment. However, there are still problems such as resource integration, environmental protection protection reform, preferential policies, project construction cooperation, and external environment. The municipal departments directly put forward many constructive suggestions and suggestions on how to solve these problems.

Mao Tengfei believes that the project is progressing rapidly and impressively; it fully affirms that Yizhang County has a high starting point for docking in the process of its opening up, strong work, and good development momentum.

Mao Tengfei proposed that the Yizhang fluoridation industry should be an important industrial base for the country and even the world. It is necessary to transform the resources advantage of Zhangzhou into an industrial advantage and an economic advantage, and to build Yizhang Fluorine Chemical Project into a billion-dollar industry. It is necessary to effectively solve the difficulties and problems in the construction of the Yizhang Fluorine Chemical Project, and promote the project to be put into production as early as possible, so as to make this project into a safe project, a quality project, a benefit project, and a public project.

Vertical Single Slide Injection Molding Machine

Vertical Injection Molding Machine



1. Each plastic cavity can be taken out by a simple manipulator, which is conducive to precision molding.



2. In small batch trial production, the mold structure is simple, low cost, and easy to unload.



3. It is easy to ensure the consistency of resin fluidity and mold temperature distribution in the mold.



4. After many earthquakes, the vertical machine has better seismic resistance than the horizontal machine due to its low center of gravity.



5. Equipped with rotating table, moving table and tilting table, it is easy to realize insert molding and in-mold combination molding.



6. The belt conveyor is easy to be installed in the middle of the mold, so as to realize the automatic production of molding.



7. Generally, the mold locking device is open around, and it is easy to configure various automatic devices, which is suitable for automatic forming of complex and delicate products.



8. The weight of the mould is supported by the horizontal formwork for opening and closing up and down. The phenomenon that the formwork cannot be opened and closed due to the forward fall caused by the gravity of the mould similar to the horizontal machine will not occur. It is beneficial to maintain the accuracy of machinery and mold for durability.



9. It is easy to realize the molding of the insert. Because the mold surface is upward, it is easy to put the insert into the position. The lower template is fixed and the upper template is movable. If the belt conveyor is combined with the manipulator, it can easily realize the automatic insert molding.



10. The injection device and mold locking device are located on the same vertical centerline, and the mold is opened and closed in the up and down directions. Its floor area is only about half of that of the horizontal machine, so it is about twice as productive.

Vertical Single Slide Injection Molding Machine,Vertical Plastic Moulding Machine,Small Vertical Injection Molding Machine,Vertical Plastic Injection Machine

Ningbo Chenwei Machinery Technology Co.,Ltd , https://www.chenweimachinery.com