Technical measures for commissioning operation of fully mechanized mining electrical equipment

1. Every day, production preparation must be done to ensure that tools, materials and spare parts are complete.

2, care for equipment, save the use of materials, keep equipment and workplace clean, and do a good job of civilized production.

3. When handling equipment, strictly follow the operation procedures of equipment transportation and transportation: a. Lifting workers and equipment transporting workers must undergo special safety technical training, pass the examination and hold the certificate. b. Under no circumstances should the human body be used to balance the weight being lifted. It should not be placed on heavy objects. When running lifting work, it is strictly forbidden to stand under the heavy objects, and can only stand on the side. A sling and spreader that has been tensioned by heavy objects.

4. Engaged in electrical equipment installation personnel:

a, must have the necessary electrical knowledge, familiar with the "Electricity Safety Work Regulations", after passing the examination, the certificate is on duty.

b. Must be familiar with the electrical installation operating procedures and conscientiously implement various rules and regulations.

c. Familiar with the construction principle of transformers, motors, combination switches and various high and low voltage switches, the wiring process of various cables, and the use of various instruments.

5. Workers entering the construction site must wear helmets and overalls. Due to the construction site, there are many units and they are mixed operations. Therefore, the construction personnel must obey the instructions of the person in charge, and it is strictly forbidden to sneak in the middle. Work that has nothing to do with the scope of work.

6. Before construction, strictly follow the switch operation in the “Electricity Safety Work Regulations”: the power supply must be disconnected, necessary safety measures must be taken, and the “someone working, no closing” sign should be hung at the operation button or handle. Cards are strictly forbidden for non-workers to enter the substation of the fully mechanized mining workshop, and special personnel are on duty at the substation.

7. Before work, strictly follow the relevant technical instructions and technical information. Test the performance of all electrical equipment and cables, and give immediate feedback to the leaders on unqualified equipment.

8. During construction, strictly follow the standard construction, take care of the equipment, and prohibit the barbaric operation. After the end of the work, check the tools and clean the work site.

9, equipment commissioning

a. Before the test run, first conduct a comprehensive review of all electrical equipment, and perform a performance test on the important equipment. After the error is correct, the test run can be performed.

b. During the test run, all staff members must follow the instructions of the person in charge of the work, keep a distance of 2 to 3 meters from the mechanical rotating part, and keep a distance of 4 meters from the electrical running part. It is strictly forbidden for anyone to approach the mechanical and electrical operating parts.

c. In the operation of switching, it must be in accordance with the operation of the switch in the "Electricity Safety Work Regulations": one person operation, one person supervision.

d. After the test run is over, check the staff, check the tools and clean the work site, check all the equipment, and number them for the underground transportation installation.

Derrick Crane

Derrick crane, also known as Roof Crane, is a specific style of lifting machine. It is usually a fixed building crane, meaning it is assembled and disassembled in the location where it is used. Generally, the crane is characterized by its long, fixed length tower. These cranes are typically used in locations where items need to be moved from a common initial point to single nearby location, like on shipping platforms and construction sites. BQ models of derrick cranes including 10T Derrick Crane 2533A, 6T Derrick Crane DCB20-6, 10T Derrick Crane DCB24-10, 12T Derrick Crane DCB30-12, 16T Derrick Crane DCB30-16, 18T Derrick Crane DCB42-18.

Roof Derrick Crane,Roof Crane,10T Derrick Crane,Derrick Crane Roof Crane,Building Crane

SHEN YANG BAOQUAN BUSINESS CO., LTD , https://www.bq-cranes.com