Model NO.: Filter cover PLUG
Runner: Hot Runner
Design Software: UG
Installation: Fixed
Certification: ISO
Standard: HASCO
Customized: Customized
Cavity Number: One Cavity
Ejection Type: by Robot
Mold Life Guarantty: 1,000,000 Cycles for Production Tool
Hot Runner Trade Name: Moldmasters, Synventive Will Be Considered
Cycle Time: 10-100 S
Injection Machine: 50-1200 Ton
Ejector System: Mechanical
Injection System: Sprue Gate/Pin Point Gate/Edge Gate/Sub Gate, etc
Mold Base Standard: Dme/Lkm/Hasco, etc
Core &Cavity Steel: 738h/P20/H13/2344/1.2344/1.2738, etc
Trademark: Enuo Mold
Transport Package: Put Into The Wooden Box with Vacuum Package
Specification: 860*1000*900mm
Origin: Dongguan of China
HS Code: 8480719090
Model NO.: Filter cover PLUG
Runner: Hot Runner
Design Software: UG
Installation: Fixed
Certification: ISO
Standard: HASCO
Customized: Customized
Cavity Number: One Cavity
Ejection Type: by Robot
Mold Life Guarantty: 1,000,000 Cycles for Production Tool
Hot Runner Trade Name: Moldmasters, Synventive Will Be Considered
Cycle Time: 10-100 S
Injection Machine: 50-1200 Ton
Ejector System: Mechanical
Injection System: Sprue Gate/Pin Point Gate/Edge Gate/Sub Gate, etc
Mold Base Standard: Dme/Lkm/Hasco, etc
Core &Cavity Steel: 738h/P20/H13/2344/1.2344/1.2738, etc
Trademark: Enuo Mold
Transport Package: Put Into The Wooden Box with Vacuum Package
Specification: 860*1000*900mm
Origin: Dongguan of China
HS Code: 8480719090
Auto Water Filter Part for Mould Manufacturing in Dongguan China
Customer: | Domestic customer |
Project No.: | Filter cover PLUG |
Material: | PA66-GF30/BASF |
Cavities: | 1*2Cavs |
Mold Size: | 500*300*500 mm |
injection Gates: | Â Hot runner |
Mold main steel: | 1.2344 |
Lead-time: | 6 weeks(including design time). |
Â
Â
Â
Auto Water Filter Part for Mould Manufacturing in Dongguan China
Customer: | Domestic customer |
Project No.: | Filter cover PLUG |
Material: | PA66-GF30/BASF |
Cavities: | 1*2Cavs |
Mold Size: | 500*300*500 mm |
injection Gates: | Â Hot runner |
Mold main steel: | 1.2344 |
Lead-time: | 6 weeks(including design time). |
Â
Â
Â
sk330 Final Drive, new holland Kobelco Travel Motor, kobelco sk330-6 Final drive
Kobelco Final Drive Travel motor
Kobelco Final Drive Travel Motor,Kobelco Reduction Gearbox,Kobelco Final Drive,Kobelco Travel Motor
JINING AOWEI MACHINE CO.,LIMITED , https://www.aoweimachine.com